PROJECT DESCRIPTION :

Summary scope of work
Obtain SEND/SDMS drawing conducting pole to pole inspection of the reticulation line verifying if the physical network is constructed as per the ENS drawing, Marking up of all required changes with GPS co-ordinates on the ENS drawing and compare them with Project Eng and Field Services ENS drawings, Recording of all defects as per Maximo MV Line requirements, Verifying if transforming size and labeling matches the ENS drawing. verifying if all section & Tee links are installed as per SLD, Number all poles as per national pole numbering standard and compile and audit report with all findings.